Helpful & Friendly AdviceCall: 01275 400456

Small Stainless Steel Wash Basin

Product Code: WBSN

Stainless steel small hand wash basin 500 x 350 x 180mm
£205.20 inc VAT£171.00 ex VAT

updown
£205.20 inc VAT£171.00 ex VAT
add to compare

Stainless Steel Hand Wash Basin - Small

Product Code WBSN

  • Stainless steel wall mounted wash basin with contrasting polished apron support.
  • Satin finish wash basin with satin finish apron support.
  • Supplied with two 22mm tap holes.
  • Complete with 32mm flush grated waste (no overflow or plug).

Size

  • 500mm wide.
  • 350mm front to back.
  • 120mm deep bowl - 180mm deep shroud / apron support
  • 60mm upstand.

Delivery

  • From stock usually 1 to 2 working days.

Optional Extras

  • Stainless steel tap hole blank.
  • 32mm plastic bottle trap.
  • 32mm chrome plated brass bottle trap with chrome pipe and wall flange.
  • Pair cross head taps.
  • Pair soft touch time flow basin taps.
  • Single time flow basin tap (cold).
  • Pair lever basin taps.
  • Lever operated mono bloc mixer tap.
  • Knee valve and spout.

**All pictures shown are for illustration purpose only and may be subject to change without notice. Actual product may vary due to product enhancement.
All dimensions shown are for guidance only and may be subject to change or alteration without notice. All items manufactured or purchased separately from a third party to fit our products should be checked against the actual dimensions of the physical product before purchase. We will not be liable for third party costs and consequential loss associated with the items not fitting third party components.**

wash-basin-dimensions

Delivery

From stock usually 1 to 2 working days.

Delivery Times

Delivery times stated on the website are indicative of the average time it takes to deliver each product. All delivery times are based on working days and do not include weekends or Bank Holidays.
For remote areas sometimes deliveries may take a little longer than specified.
We will contact you if there are any known delays in the delivery times on your order.

Delivery Method

All orders are despatched by the most suitable and economic method.
If you have ordered several items they may arrive separately to make sure they are delivered by the quickest and most appropriate method, and to guarantee you get the best prices.
Please note our carriers do not offer fixed time slots, and due to time constraints are not able to telephone before delivering. 

related products